ISO 9001 Function Flow Work Instructions
| Doc. # | Document Title | Spanish | Revision Info |
|---|---|---|---|
| WI-8.2.4.1 | Cast Heaters Functional Flow | Sp | Revision: 02: 5-1-2021 |
| WI-8.2.4.2 | Sheet Metal Typical Functional Flow |
Sp | Revision: 03: 5-23-2023 |
| WI-8.2.4.3 | SHS Typical Functional Flow | Sp | Revision: 01: 5-13-2016 |
| WI-8.2.4.4 | MI (Mineral Insulated) Thermocouple Typical Functional Flow | Sp | Revision: 00: 1-27-2009 |
| WI-8.2.4.5 | RTD & Thermistor Typical Functional Flow |
Sp | Revision: 00: 1-27-2009 |
| WI-8.2.4.6 | Tube & Wire Thermocouple Typical Functional Flow | Sp | Revision: 00: 1-27-2009 |
| WI-8.2.4.7 | Mica Heaters Typical Functional Flow |
Sp | Revision: 02: 4-21-2021 |
| WI-8.2.4.8 | Manufactured Items Typical Functional Flow | Sp | Revision: 01: 6-2-2016 |
| WI-8.2.4.9 | TEC Items Typical Functional Flow |
Sp | Revision: 03: 6-2-2016 |
| WI-8.2.4.10 | Welding Process | Sp | Revision: 00: 4-15-2009 |
| WI-8.2.4.11 | Hi- Density (HD) Cartridge Heaters Typical Functional Flow | Sp | Revision: 02: 2-04-2025 |
| WI-8.2.4.12 | Tubular Heating Elements (THE) Typical Functional Flow | Sp | Obsolete See WI-8.2.4.13 |
| WI-8.2.4.13 | Process Heaters Typical Functional Flow | Sp | Revision: 04: 2-10-2025 |
| WI-8.2.4.14 | Low Density (LD) Cartridge Heaters Typical Functional Flow | Sp | Revision: 00: 1-27-2009 |
| WI-8.2.4.15 | Ceramic Band Typical Functional Flow | Sp | Revision: 01: 2-21-2022 |
| WI-8.2.4.16 | Maxiband Typical Functional Flow |
Sp | Revision: 01: 5-27-2010 |
| WI-8.2.4.17 | MI Typical Functional Flow | Sp | Revision: 02: 5-28-2025 |
| WI-8.2.4.18 | Brazing Process | Sp | Revision: 00: 4-15-2009 |
| WI-8.2.4.19 | Calibrating and/or Verifying Measuring and Test Equipment In-House | Sp | Revision: 04: 6-15-2020 |
| WI-8.2.4.20 | Reduction of Mineral Insulated Cables |
Sp | Revision: 02: 5-15-2026 |
| WI-8.2.4.21 | Painting Process | Sp | Revision: 01: 6-9-2014 |
| WI-8.2.4.22 | Inspection Procedures Cable & Coil Heater Assemblies | Sp | Revision: 01: 2-16-2016 |
| WI-8.2.4.23 | Wire Cleaning for Cable Heaters |
Sp | Revision: 00: 5-22-2009 |
| WI-8.2.4.24 | Mold Marking Criteria & Metal Pouring Temperature for Sand Mold and Instructions to Run Permanent Mold & Cooling Tube Coating | Sp | Revision: 02: 5-30-2017 |
| WI-8.2.4.25 | Potting Chart | Sp | Revision: 03: 5-29-2020 |
| WI-8.2.4.26 | Infrared Department Coil Preparation | Sp | Revision: 01: 6-11-2012 |
| WI-8.2.4.27 | Infrared Department Slip, Glaze Mixing & Control |
Sp | Revision: 03: 3-09-2022 |
| WI-8.2.4.28 | Infrared Department Product ID & Traceability | Sp | Obsolete |
| WI-8.2.4.29 | Infrared Department Glazing | Sp | Revision: 01: 6-11-2012 |
| WI-8.2.4.30 | Infrared Department Kiln Firing | Sp | Revision: 02: 6-11-2012 |
| WI-8.2.4.31 | Ceramic Infrared Heaters Functional Flow | Sp | Revision: 03: 5-20-2016 |
| WI-8.2.4.32 | Tube Cleaning for Ferrous & Nickel Base Alloys | Sp | Revision: 00: 5-22-2009 |
| WI-8.2.4.33 | Drying/Baking Instructions | Sp | Revision: 03: 3-4-2020 |
| WI-8.2.4.34 | Sunbeam Exo-Gas Annealing Furnace | Sp | Revision: 00: 5-28-2009 |
| WI-8.2.4.35 | Cable & Coil Heater Functional Flow | Sp | Revision: 03: 4-23-2026 |
| WI-8.2.4.36 | Baking/Drying of MI-Plus Heaters | Sp | Revision: 01: 5-24-2010 |
| WI-8.2.4.37 | Sandblasting Elements | Sp | Revision: 01: 5-18-2010 |
| WI-8.2.4.38 | Restricted Document – Slip & Glaze Formulation | Revision: 06: 3-09-2022 | |
| WI-8.2.4.39 | CNC Welding Machine | Sp | Revision: 01: 5-25-2017 |
| WI-8.2.4.40 | Typical Soft Solder Operations | Sp | Revision: 00: 6-22-2011 |
| WI-8.2.4.41 | Spot Welding Tubular | Sp | Revision: 00: 12-16-2011 |
| WI-8.2.4.42 | Adhesives and Coatings | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.43 | GEM Heater Functional Flow | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.44 | Green Production | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.45 | KTE Heater Functional Flow | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.46 | Plaster Mold Production | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.47 | Reflective Coating Application | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.48 | Rubber Mold Production | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.49 | VS Glow Housing Production | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.50 | VS Glow With IR Lamp Heater Assembly Functional Flow | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.51 | VSR Assembly Functional Flow | Sp | Revision: 00: 6-11-2012 |
| WI-8.2.4.52 | Infrared Department Kiln Program Selection | Sp | Revision: 00: 6-6-2013 |
| WI-8.2.4.53 | Incoming Receiving Typical Functional Flow | Sp | Revision: 02: 4-01-2019 |
| WI-8.2.4.54 | Machine Shop Inspection Guideline | Sp | Revision: 00: 5-1-2014 |
| WI-8.2.4.55 | Inspection Procedures for Temperature Sensors | Sp | Revision: 00: 7-28-2017 |
| WI-8.2.4.56 | Passivation Process | Sp | Revision: 00: 4-1-2021 |
| Document Title | Spanish | Doc. # | Revision Info |
|---|---|---|---|
| Adhesives and Coatings | Sp | WI-8.2.4.42 | Revision: 00: 6-11-2012 |
| Baking/Drying of MI-Plus Heaters | Sp | WI-8.2.4.36 | Revision: 01: 5-24-2010 |
| Brazing Process | Sp | WI-8.2.4.18 | Revision: 00: 4-15-2009 |
| Cable & Coil Heater Functional Flow |
Sp | WI-8.2.4.35 | Revision: 03: 4-23-2026 |
| Calibrating and/or Verifying Measuring & Test Equipment In-House | Sp | WI-8.2.4.19 | Revision: 04: 6-15-2020 |
| Cast Heaters Typical Functional Flow | Sp | WI-8.2.4.1 | Revision: 02: 5-1-2021 |
| Ceramic Band Typical Functional Flow | Sp | WI-8.2.4.15 | Revision: 01: 2-21-2022 |
| Ceramic Infrared Heaters Functional Flow |
Sp | WI-8.2.4.31 | Revision: 03: 5-20-2016 |
| CNC Welding Machine | Sp | WI-8.2.4.39 | Revision: 01: 5-25-2017 |
| Drying/Baking Instructions | Sp | WI-8.2.4.33 | Revision: 03: 3-4-2020 |
| GEM Heater Functional Flow |
Sp | WI-8.2.4.43 | Revision: 00: 6-11-2012 |
| Green Production | Sp | WI-8.2.4.44 | Revision: 00: 6-11-2012 |
| Hi- Density (HD) Cartridge Heaters Typical Functional Flow | Sp | WI-8.2.4.11 | Revision: 01: 2-28-2020 |
| Incoming Receiving Typical Functional Flow | Sp | WI-8.2.4.53 | Revision: 02: 4-01-2019 |
| Infrared Department Coil Preparation | Sp | WI-8.2.4.26 | Revision: 01: 6-11-2012 |
| Infrared Department Glazing | Sp | WI-8.2.4.29 | Revision: 01: 6-11-2012 |
| Infrared Department Kiln Firing |
Sp | WI-8.2.4.30 | Revision: 02: 6-11-2012 |
| Infrared Department Kiln Program Selection | Sp | WI-8.2.4.52 | Revision: 00: 6-6-2013 |
| Infrared Department Product ID & Traceability | Sp | WI-8.2.4.28 | Obsolete |
| Infrared Department Slip, Glaze Mixing & Control | Sp | WI-8.2.4.27 | Revision: 03: 3-09-2022 |
| Inspection Procedures Cable & Coil Heater Assemblies | Sp | WI-8.2.4.22 | Revision: 01: 2-16-2016 |
| Inspection Procedures for Temperature Sensors |
Sp | WI-8.2.4.55 | Revision: 00: 7-28-2017 |
| KTE Heater Functional Flow |
Sp | WI-8.2.4.45 | Revision: 00: 6-11-2012 |
| Low Density (LD) Cartridge Heaters Typical Functional Flow | Sp | WI-8.2.4.14 | Revision: 00: 1-27-2009 |
| Machine Shop Inspection Guideline | Sp | WI-8.2.4.54 | Revision: 00: 5-1-2014 |
| Manufactured Items Typical Functional Flow | Sp | WI-8.2.4.8 | Revision: 01: 6-2-2016 |
| Maxiband Typical Functional Flow |
Sp | WI-8.2.4.16 | Revision: 01: 5-27-2010 |
| Mold Marking Criteria & Metal Pouring Temperature for Sand Mold and Instructions to Run Permanent Mold & Cooling Tube Coating | Sp | WI-8.2.4.24 | Revision: 02: 5-30-2017 |
| MI (Mineral Insulated) Thermocouple Typical Functional Flow | Sp | WI-8.2.4.4 | Revision: 00: 1-27-2009 |
| MI Typical Functional Flow | Sp | WI-8.2.4.17 | Revision: 03: 5-28-2025 |
| Mica Heaters Typical Functional Flow | Sp | WI-8.2.4.7 | Revision: 02: 4-21-2021 |
| Painting Process | Sp | WI-8.2.4.21 | Revision: 01: 6-9-2014 |
| Passivation Process | Sp | WI-8.2.4.56 | Revision: 00: 4-1-2021 |
| Plaster Mold Production | Sp | WI-8.2.4.46 | Revision: 00: 6-11-2012 |
| Potting Chart | Sp | WI-8.2.4.25 | Revision: 03: 5-29-2020 |
| Process Heaters Typical Functional Flow | Sp | WI-8.2.4.13 | Revision: 03: 5-7-2019 |
| Reduction of Mineral Insulated Cables |
Sp | WI-8.2.4.20 | Revision: 02: 5-15-2026 |
| Reflective Coating Application | Sp | WI-8.2.4.47 | Revision: 00: 6-11-2012 |
| RTD & Thermistor Typical Functional Flow | Sp | WI-8.2.4.5 | Revision: 00: 1-27-2009 |
| Rubber Mold Production | Sp | WI-8.2.4.48 | Revision: 00: 6-11-2012 |
| Sandblasting Elements | Sp | WI-8.2.4.37 | Revision: 01: 5-18-2010 |
| Sheet Metal Typical Functional Flow | Sp | WI-8.2.4.2 | Revision: 03: 5-23-2023 |
| SHS Typical Functional Flow |
Sp | WI-8.2.4.3 | Revision: 01: 5-13-2016 |
| Slip & Glaze Formulation | WI-8.2.4.38 | Restricted Document Revision: 06: 3-09-2022 | |
| Spot Welding Tubular | Sp | WI-8.2.4.41 | Revision: 00: 12-16-2011 |
| Sunbeam Exo-Gas Annealing Furnace | Sp | WI-8.2.4.34 | Revision: 00: 5-28-2009 |
| TEC Items Typical Functional Flow |
Sp | WI-8.2.4.9 | Revision: 03: 6-2-2016 |
| Tube & Wire Thermocouple Typical Functional Flow | Sp | WI-8.2.4.6 | Revision: 00: 1-27-2009 |
| Tube Cleaning for Ferrous & Nickel Base Alloys | Sp | WI-8.2.4.32 | Revision: 00: 5-22-2009 |
| Tubular Heating Elements (THE) Typical Functional Flow | Sp | WI-8.2.4.12 | Obsolete See WI-8.2.4.13 |
| Typical Soft Solder Operations | Sp | WI-8.2.4.40 | Revision: 00: 6-22-2011 |
| VS Glow Housing Production | Sp | WI-8.2.4.49 | Revision: 00: 6-11-2012 |
| VS Glow with IR Lamp Heater Assembly Functional Flow | Sp | WI-8.2.4.50 | Revision: 00: 6-11-2012 |
| VSR Assembly Functional Flow |
Sp | WI-8.2.4.51 | Revision: 00: 6-11-2012 |
| Welding Process | Sp | WI-8.2.4.10 | Revision: 00: 4-15-2009 |
| Wire Cleaning for Cable Heaters |
Sp | WI-8.2.4.23 | Revision: 00: 5-22-2009 |