Work Instructions (Function Flows)

ISO 9001 Function Flow Work Instructions

Doc. # Document Title Spanish Revision Info
WI-8.2.4.1 Cast Heaters Functional Flow Sp Revision: 02: 5-1-2021
WI-8.2.4.2 Sheet Metal Typical
Functional Flow
Sp Revision: 03: 5-23-2023
WI-8.2.4.3 SHS Typical Functional Flow Sp Revision: 01: 5-13-2016
WI-8.2.4.4 MI (Mineral Insulated) Thermocouple Typical Functional Flow Sp Revision: 00: 1-27-2009
WI-8.2.4.5 RTD & Thermistor Typical
Functional Flow
Sp Revision: 00: 1-27-2009
WI-8.2.4.6 Tube & Wire Thermocouple Typical Functional Flow Sp Revision: 00: 1-27-2009
WI-8.2.4.7 Mica Heaters Typical
Functional Flow
Sp Revision: 02: 4-21-2021
WI-8.2.4.8 Manufactured Items Typical Functional Flow Sp Revision: 01: 6-2-2016
WI-8.2.4.9 TEC Items Typical
Functional Flow
Sp Revision: 03: 6-2-2016
WI-8.2.4.10 Welding Process Sp Revision: 00: 4-15-2009
WI-8.2.4.11 Hi- Density (HD) Cartridge Heaters Typical Functional Flow Sp Revision: 02: 2-04-2025
WI-8.2.4.12 Tubular Heating Elements (THE) Typical Functional Flow Sp Obsolete
See WI-8.2.4.13
WI-8.2.4.13 Process Heaters Typical Functional Flow Sp Revision: 04: 2-10-2025
WI-8.2.4.14 Low Density (LD) Cartridge Heaters Typical Functional Flow Sp Revision: 00: 1-27-2009
WI-8.2.4.15 Ceramic Band Typical Functional Flow Sp Revision: 01: 2-21-2022
WI-8.2.4.16 Maxiband Typical
Functional Flow
Sp Revision: 01: 5-27-2010
WI-8.2.4.17 MI Typical Functional Flow Sp Revision: 02: 5-28-2025
WI-8.2.4.18 Brazing Process Sp Revision: 00: 4-15-2009
WI-8.2.4.19 Calibrating and/or Verifying Measuring and Test Equipment In-House Sp Revision: 04: 6-15-2020
WI-8.2.4.20 Reduction of Mineral
Insulated Cables
Sp Revision: 02: 5-15-2026
WI-8.2.4.21 Painting Process Sp Revision: 01: 6-9-2014
WI-8.2.4.22 Inspection Procedures Cable & Coil Heater Assemblies Sp Revision: 01: 2-16-2016
WI-8.2.4.23 Wire Cleaning for
Cable Heaters
Sp Revision: 00: 5-22-2009
WI-8.2.4.24 Mold Marking Criteria & Metal Pouring Temperature for Sand Mold and Instructions to Run Permanent Mold & Cooling Tube Coating Sp Revision: 02: 5-30-2017
WI-8.2.4.25 Potting Chart Sp Revision: 03: 5-29-2020
WI-8.2.4.26 Infrared Department Coil Preparation Sp Revision: 01: 6-11-2012
WI-8.2.4.27 Infrared Department Slip,
Glaze Mixing & Control
Sp Revision: 03: 3-09-2022
WI-8.2.4.28 Infrared Department Product ID & Traceability Sp Obsolete
WI-8.2.4.29 Infrared Department Glazing Sp Revision: 01: 6-11-2012
WI-8.2.4.30 Infrared Department Kiln Firing Sp Revision: 02: 6-11-2012
WI-8.2.4.31 Ceramic Infrared Heaters Functional Flow Sp Revision: 03: 5-20-2016
WI-8.2.4.32 Tube Cleaning for Ferrous & Nickel Base Alloys Sp Revision: 00: 5-22-2009
WI-8.2.4.33 Drying/Baking Instructions Sp Revision: 03: 3-4-2020
WI-8.2.4.34 Sunbeam Exo-Gas Annealing Furnace Sp Revision: 00: 5-28-2009
WI-8.2.4.35 Cable & Coil Heater Functional Flow Sp Revision: 03: 4-23-2026
WI-8.2.4.36 Baking/Drying of MI-Plus Heaters Sp Revision: 01: 5-24-2010
WI-8.2.4.37 Sandblasting Elements Sp Revision: 01: 5-18-2010
WI-8.2.4.38 Restricted Document Slip & Glaze Formulation Revision: 06: 3-09-2022
WI-8.2.4.39 CNC Welding Machine Sp Revision: 01: 5-25-2017
WI-8.2.4.40 Typical Soft Solder Operations Sp Revision: 00: 6-22-2011
WI-8.2.4.41 Spot Welding Tubular Sp Revision: 00: 12-16-2011
WI-8.2.4.42 Adhesives and Coatings Sp Revision: 00: 6-11-2012
WI-8.2.4.43 GEM Heater Functional Flow Sp Revision: 00: 6-11-2012
WI-8.2.4.44 Green Production Sp Revision: 00: 6-11-2012
WI-8.2.4.45 KTE Heater Functional Flow Sp Revision: 00: 6-11-2012
WI-8.2.4.46 Plaster Mold Production Sp Revision: 00: 6-11-2012
WI-8.2.4.47 Reflective Coating Application Sp Revision: 00: 6-11-2012
WI-8.2.4.48 Rubber Mold Production Sp Revision: 00: 6-11-2012
WI-8.2.4.49 VS Glow Housing Production Sp Revision: 00: 6-11-2012
WI-8.2.4.50 VS Glow With IR Lamp Heater Assembly Functional Flow Sp Revision: 00: 6-11-2012
WI-8.2.4.51 VSR Assembly Functional Flow Sp Revision: 00: 6-11-2012
WI-8.2.4.52 Infrared Department Kiln Program Selection Sp Revision: 00: 6-6-2013
WI-8.2.4.53 Incoming Receiving Typical Functional Flow Sp Revision: 02: 4-01-2019
WI-8.2.4.54 Machine Shop Inspection Guideline Sp Revision: 00: 5-1-2014
WI-8.2.4.55 Inspection Procedures for Temperature Sensors Sp Revision: 00: 7-28-2017
WI-8.2.4.56 Passivation Process Sp Revision: 00: 4-1-2021

Document Title Spanish Doc. # Revision Info
Adhesives and Coatings Sp WI-8.2.4.42 Revision: 00: 6-11-2012
Baking/Drying of MI-Plus Heaters Sp WI-8.2.4.36 Revision: 01: 5-24-2010
Brazing Process Sp WI-8.2.4.18 Revision: 00: 4-15-2009
Cable & Coil Heater
Functional Flow
Sp WI-8.2.4.35 Revision: 03: 4-23-2026
Calibrating and/or Verifying Measuring & Test Equipment In-House Sp WI-8.2.4.19 Revision: 04: 6-15-2020
Cast Heaters Typical Functional Flow Sp WI-8.2.4.1 Revision: 02: 5-1-2021
Ceramic Band Typical Functional Flow Sp WI-8.2.4.15 Revision: 01: 2-21-2022
Ceramic Infrared Heaters
Functional Flow
Sp WI-8.2.4.31 Revision: 03: 5-20-2016
CNC Welding Machine Sp WI-8.2.4.39 Revision: 01: 5-25-2017
Drying/Baking Instructions Sp WI-8.2.4.33 Revision: 03: 3-4-2020
GEM Heater
Functional Flow
Sp WI-8.2.4.43 Revision: 00: 6-11-2012
Green Production Sp WI-8.2.4.44 Revision: 00: 6-11-2012
Hi- Density (HD) Cartridge Heaters Typical Functional Flow Sp WI-8.2.4.11 Revision: 01: 2-28-2020
Incoming Receiving Typical Functional Flow Sp WI-8.2.4.53 Revision: 02: 4-01-2019
Infrared Department Coil Preparation Sp WI-8.2.4.26 Revision: 01: 6-11-2012
Infrared Department Glazing Sp WI-8.2.4.29 Revision: 01: 6-11-2012
Infrared Department
Kiln Firing
Sp WI-8.2.4.30 Revision: 02: 6-11-2012
Infrared Department Kiln Program Selection Sp WI-8.2.4.52 Revision: 00: 6-6-2013
Infrared Department Product ID & Traceability Sp WI-8.2.4.28 Obsolete
Infrared Department Slip, Glaze Mixing & Control Sp WI-8.2.4.27 Revision: 03: 3-09-2022
Inspection Procedures Cable & Coil Heater Assemblies Sp WI-8.2.4.22 Revision: 01: 2-16-2016
Inspection Procedures for
Temperature Sensors
Sp WI-8.2.4.55 Revision: 00: 7-28-2017
KTE Heater
Functional Flow
Sp WI-8.2.4.45 Revision: 00: 6-11-2012
Low Density (LD) Cartridge Heaters Typical Functional Flow Sp WI-8.2.4.14 Revision: 00: 1-27-2009
Machine Shop Inspection Guideline Sp WI-8.2.4.54 Revision: 00: 5-1-2014
Manufactured Items Typical Functional Flow Sp WI-8.2.4.8 Revision: 01: 6-2-2016
Maxiband Typical
Functional Flow
Sp WI-8.2.4.16 Revision: 01: 5-27-2010
Mold Marking Criteria & Metal Pouring Temperature for Sand Mold and Instructions to Run Permanent Mold & Cooling Tube Coating Sp WI-8.2.4.24 Revision: 02: 5-30-2017
MI (Mineral Insulated) Thermocouple Typical Functional Flow Sp WI-8.2.4.4 Revision: 00: 1-27-2009
MI Typical Functional Flow Sp WI-8.2.4.17 Revision: 03: 5-28-2025
Mica Heaters Typical Functional Flow Sp WI-8.2.4.7 Revision: 02: 4-21-2021
Painting Process Sp WI-8.2.4.21 Revision: 01: 6-9-2014
Passivation Process Sp WI-8.2.4.56 Revision: 00: 4-1-2021
Plaster Mold Production Sp WI-8.2.4.46 Revision: 00: 6-11-2012
Potting Chart Sp WI-8.2.4.25 Revision: 03: 5-29-2020
Process Heaters Typical Functional Flow Sp WI-8.2.4.13 Revision: 03: 5-7-2019
Reduction of Mineral
Insulated Cables
Sp WI-8.2.4.20 Revision: 02: 5-15-2026
Reflective Coating Application Sp WI-8.2.4.47 Revision: 00: 6-11-2012
RTD & Thermistor Typical Functional Flow Sp WI-8.2.4.5 Revision: 00: 1-27-2009
Rubber Mold Production Sp WI-8.2.4.48 Revision: 00: 6-11-2012
Sandblasting Elements Sp WI-8.2.4.37 Revision: 01: 5-18-2010
Sheet Metal Typical Functional Flow Sp WI-8.2.4.2 Revision: 03: 5-23-2023
SHS Typical
Functional Flow
Sp WI-8.2.4.3 Revision: 01: 5-13-2016
Slip & Glaze Formulation WI-8.2.4.38 Restricted Document Revision: 06: 3-09-2022
Spot Welding Tubular Sp WI-8.2.4.41 Revision: 00: 12-16-2011
Sunbeam Exo-Gas Annealing Furnace Sp WI-8.2.4.34 Revision: 00: 5-28-2009
TEC Items Typical
Functional Flow
Sp WI-8.2.4.9 Revision: 03: 6-2-2016
Tube & Wire Thermocouple Typical Functional Flow Sp WI-8.2.4.6 Revision: 00: 1-27-2009
Tube Cleaning for Ferrous & Nickel Base Alloys Sp WI-8.2.4.32 Revision: 00: 5-22-2009
Tubular Heating Elements (THE) Typical Functional Flow Sp WI-8.2.4.12 Obsolete See WI-8.2.4.13
Typical Soft Solder Operations Sp WI-8.2.4.40 Revision: 00: 6-22-2011
VS Glow Housing Production Sp WI-8.2.4.49 Revision: 00: 6-11-2012
VS Glow with IR Lamp Heater Assembly Functional Flow Sp WI-8.2.4.50 Revision: 00: 6-11-2012
VSR Assembly
Functional Flow
Sp WI-8.2.4.51 Revision: 00: 6-11-2012
Welding Process Sp WI-8.2.4.10 Revision: 00: 4-15-2009
Wire Cleaning for
Cable Heaters
Sp WI-8.2.4.23 Revision: 00: 5-22-2009